Prerequisite for modulation :
Make sure that your console is compatible to do modulation. This compatibility depends on the way your console works.
If it operates in "Isobus" mode (the task controller is active), the activation of the modulation function is systematic. The cable used is an Isobus model.
If it operates in "TUVR" mode (Trimble language. The console is Isobus but only to display the tool commands. No task controller), an activation key is required. This is the same as for the section cut-off. The cable connecting the Trimble console to the implement console must be appropriate.
Preliminary steps before importing on the console :
1 - Before importing your recommendation card in the usb key, extract the .SHP, .DBF, .SHX files from it.
Right click on your recommendation file then: extract here

2 - Create a folder called "AgGPS" and then create a "Prescriptions" folder in this folder (make sure to respect capital letters).
Move the extracted files to this folder, then move the folder to your usb key. It is possible to import several modulation cards simultaneously into this folder.
You can now remove your usb key and go to your console.
Import to your console :
3 - Insert the usb key in the console then switch on the console.
4 - Click on " data file ".
4 - Click on OK
5 - click on " Prescriptions ".
6 - Click on " copy ".
7 - Waiting
8 - Click on ok
9 - Click again on ok
10 - Click on the tractor icon
11 - The icon must be displayed: the option is activated, click on ok
12 - Waiting
13 - Select the customer, farm, field and event then click ok.
14 - Select prescription
15 - Select the value column: value
16 - Assign 1 to the "prescription scaling factor" box if the recommendation is in Kg/ha or L/ha.
17 - Click on ok
18 - Waiting
19 - The recommendation is displayed in the background.
Dose modulation is ready